38th Remodel: This was an expensive and time consuming remodel. First off all the house was full of stuff when I got it. Secondly, there was a non permitted structure in the back, which needed to have a new foundation put on (basically the entire back room was rebuilt). The electric in the house had to be totally re-done, with a new panel being installed. The kitchen was replaced. The flooring was replaced with laminate throughout.
This project required an architect and constant trips to the City Building department.
In the end the project turned out very nice, check out the slider for after photos and the slider for previous, below. Also for a full image run down of the build, check out the photo albums at 38th: Before, 38th: During, 38th: Completion, 38th: Completion Photographer.